Rivers in Georgia
Shoal Creek at GA 108 near Waleska
Below flood stage
2.00ftStage
Observed Mon, Sep 28, 12:15 PM EDT
- Flood stage
- 14.00 ft
- Record crest
- 14.70 ft2025
Flood stages and impacts
| Category | Stage |
|---|---|
| Major flood | 24.00 ft |
| Moderate flood | 19.00 ft |
| Minor flood | 14.00 ft |
| Action | 11.00 ft |
- 24.00 ftMajor flooding begins. Widespread inundation flooding occurs in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. Flood waters will be topping the bridge and erosion may occur on the sides of the embankment. The road will be under two feet of water and county officials will have it closed. The old Moore Mill grounds will be flooded to the top of the pavilion.
- 22.00 ftSignificant flooding continues in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. The water level will be hitting the bridge and erosion may occur on the sides of the embankment. County officals will likely have it closed. The road will begin to flood on the southwest side of the bridge. The old Moore Mill grounds and pavilion will be flooded.
- 19.00 ftModerate flooding begins. Significant flood occurs in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. The water level will reach the bottom of the bridge and county officials may need to close it. Flood waters will be reaching a pavilion on the old Moore Mill grounds.
- 18.00 ftMinor flooding expands further into the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. Most of the old Moore Mill grounds will be flooded.
- 16.00 ftMinor flooding continues in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. A large portion of the old Moore Mill grounds will be under one to four feet of water.
- 14.00 ftFlood stage is reached. Minor flooding begins in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. Portions of the old Moore Mill grounds will be under one to two feet of water.
- 12.00 ftBankfull conditions continue in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108. Low portions of the old Moore Mill grounds begin to flood.
- 11.00 ftBankfull conditions are reached in the fields and woodlands along the creek upstream and downstream from the gage on Fincher Road or Georgia Highway 108.
Crest history
3 crests on NOAA’s list since 2009.
| # | Date | Stage |
|---|---|---|
| 1 | February 13, 2025 | 14.70 ft |
| 2 | January 9, 2024 | 11.03 ft |
| 3 | January 6, 2009 | 10.87 ft |
Most recent crests
- February 13, 2025: 14.70 ft
- January 9, 2024: 11.03 ft
- January 6, 2009: 10.87 ft
Nearby
Upstream, downstream and the gauges around this one.
- Etowah River at Canton
- Hickory Log Creek at Canton
- Etowah River Downstream I-575 at Downstream I-575 at Canton
- Etowah River at Allatoona Lake near Cartersville
- Etowah River at Allatoona Dam above Cartersville
- Little River at GA 5 near Woodstock
- Sharp Mountain Creek at Old GA 5 below Ball Ground
- Noonday Creek at Shallowford River near Woodstock
What this means
Forecasts by the Southeast River Forecast Center. Forecasts are not available. Only observed stages are available for this point. Automated gauge readings are now available, courtesy of the USGS.
Sources
Stage, flood stages, impacts and crest history from NOAA’s National Water Prediction Service. Streamflow and the daily record from the U.S. Geological Survey.