Rivers in Georgia

Yellow River near Milstead

Rockdale County, GeorgiaNWS MSDG1USGS 02207300Peachtree City office

Below flood stage
5.46ftStage

Observed Mon, Sep 21, 2:30 AM EDT

Flood stage
13.00 ft

Open the live map with the river flood outlook

Flood stages and impacts

CategoryStage
Major flood21.00 ft
Moderate flood17.00 ft
Minor flood13.00 ft
Action11.00 ft
  1. 23.00 ftMajor flooding expands further into the woodlands upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway. The bridge forms an obstacle and acts like a dam causing some backwater and erosion eddies to the sides of the bridge. Water begins to top the bridge and flood portions of the highway. It will be closed by local officials. Most of the service road leading to the Milstead Hydroelectric Plant will be flooded and water will begin to flood the plant.
  2. 21.00 ftMajor flooding begins and expands further into the woodlands upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway. The bridge forms an obstacle and acts like a dam causing some backwater and erosion eddies to the sides of the bridge. Water begins to cover the highway just south of the bridge and it will be closed by local officials. Portions of the service road leading to the Milstead Hydroelectric Plant will be flooded and water will be reaching the foundation of the plant.
  3. 19.00 ftModerate flooding continues to expand further into the woodlands near the river upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway. The bridge forms an obstacle and acts like a dam causing some backwater and erosion eddies to the sides of the bridge. The bridge will likely be closed by local officials. The service road on the right bank leading to the Milstead Hydroelectric Plant will begin to flood near the masonary dam which is around 1050 feet downstream from the bridge.
  4. 17.00 ftModerate flooding begins. Significant flooding will continue to expand further into the woodlands upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway. The water level reaches the bottom of the bridge. This may cause local officials to close it due to possible erosion around the supports. The service road on the right bank leading to the Milstead Hydroelectric Plant will begin to flood near the masonary dam which is around 1050 feet downstream from the bridge.
  5. 15.00 ftMinor flooding will continue to expand further into the woodlands upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway.
  6. 13.00 ftFlood stage is reached. Minor flooding will occur in portions of the woodlands near the river upstream and downstream from the gage on Georgia Highway 20 or Loganville Highway.
  7. 11.00 ftBankfull conditions are reached upstream and downstream from the stream gage at Georgia Highway 20 bridge or Loganville Highway.

Nearby

Upstream, downstream and the gauges around this one.

What this means

Forecasts by the Southeast River Forecast Center. Forecasts are not available. Only observed stages are available for this point. Automated gauge readings are now available, courtesy of the USGS.

Sources

Stage, flood stages, impacts and crest history from NOAA’s National Water Prediction Service. Streamflow and the daily record from the U.S. Geological Survey.