Rivers in Georgia
Coosa River at Plant Hammond
Flood stages and impacts
- 589.00 ftNear record flooding occurs upstream and downstream from Plant Hammond. Most of the access road behind the plant will be flooded up to 16 feet deep in some locations. Flood waters associcated with Cabin Creek will completely surround the Plant Hammond property. The water will be 10 feet deep in the power supply building for intakes to a pulp mill plant just upstream. Cabin Creek between the two plants and Beech Creek southeast of the mill will be flooded and cutting off access to the local roads.
- 587.00 ftWidespread and major inundation flooding occurs upstream and downstream from Plant Hammond. Most of the access road behind the plant will be flooded up to 14 feet deep in some locations. Flood waters associcated with Cabin Creek will surround the Plant Hammond property. The water will be 8 feet deep in the power supply building for intakes to a pulp mill plant just upstream. Cabin Creek between the two plants and Beech Creek southeast of the mill will be flooded and likely affecting access to local roads.
- 585.00 ftWidespread and major inundation flooding occurs upstream and downstream from Plant Hammond. Most of the access road behind the plant will be flooded up to 12 feet deep in some locations. Flood waters associcated with Cabin Creek will surround the Plant Hammond property. The water will be 6 feet deep in the power supply building for intakes to a pulp mill plant just upstream. Cabin Creek between the two plants and Beech Creek southeast of the mill will be flooded and potentially affecting the local roads.
- 583.00 ftMajor flooding expands with widespread inundation flooding upstream and downstream from the gage behind Plant Hammond. Most of the access road behind the plant will be flooded up to 10 feet deep in some locations. The flood waters will be 4 feet deep in the power supply building for intakes to a pulp mill plant around one half mile upstream from the gage. Cabin Creek between the two plants and Beech Creek southeast of the pulp mill plant will be flooded.
- 581.00 ftMajor flooding continues with widespread inundation flooding upstream and downstream from the gage behind Plant Hammond. Most of the access road behind the plant will be flooded up to 8 feet deep in some locations. The flood waters will be two feet deep in the power supply building for intakes to a pulp mill plant around one half mile upstream from the gage. Cabin Creek between the two plants and Beech Creek southeast of the pulp mill plant will be backed up and flooded.
- 579.00 ftMajor flooding begins upstream and downstream from the gage behind Plant Hammond. The access road near the intakes behind the plant will be under 6 feet of water. The boat ramp near the intakes and a small portion of an access road near and under the Georgia Highway 100 bridge will be under 9 feet of water. The flood waters will reach the foundation of a power supply building for intakes to a pulp mill plant just upstream from the gage. Cabin Creek between the two plants will begin to back up and flood.
- 577.00 ftSignificant flooding continues in the woodlands and fields along the river upstream and downstream from the gage behind Plant Hammond. The access road near the intakes behind the plant will be under 4 feet of water. The boat ramp near the intakes and a small portion of an access road near and under the Georgia Highway 100 bridge will be under 7 feet of water. The water level will approach the foundation of a power supply building for intakes to a pulp mill plant around one half mile upstream from the gage.
- 575.00 ftModerate flooding begins. Significant flooding occurs in the woodlands...fields and pasture along the river upstream and downstream from the gage behind Plant Hammond. The access road near the intakes behind the plant will be under two feet of water. The boat ramp near the intakes and a small portion of an access road near and under the Georgia Highway 100 bridge will be under 5 feet of water.
- 573.00 ftMinor flooding continues to expand further into the woodlands...fields and pasture along the river upstream and downstream from the gage behind Plant Hammond. The access road near the intakes behind the plant begins to flood. The boat ramp near the intakes and a small portion of an access road near and under the Georgia Highway 100 bridge will be under 3 feet of water.
- 572.00 ftMinor flooding continues in the woodlands...fields and pastures along the river upstream and downstream from the gage behind Plant Hammond. The water reaches a low lying portion of a parking lot near the intakes behind the plant. The boat ramp near the intakes and a small portion of an access road near and under the Georgia Highway 100 bridge will be under two feet of water.
- 570.00 ftFlood stage is reached. Minor flooding begins of woodlands...fields and pasture along the river upstream and downstream from the gage behind Plant Hammond. A boat ramp near the intakes of the plant will be under water. A small portion of an access road near and under the Georgia Highway 100 bridge will begin to flood.
- 568.00 ftBankfull conditions are reached upstream and downstream along the river from the gage behind Plant Hammond.
Crest history
49 crests on NOAA’s list since 1886.
| # | Date | Stage |
|---|---|---|
| 1 | April 1, 1886 | 589.80 ft |
| 2 | January 22, 1947 | 583.20 ft |
| 3 | December 30, 1932 | 583.10 ft |
| 4 | April 8, 1936 | 582.90 ft |
| 5 | February 12, 1946 | 582.80 ft |
| 6 | November 30, 1948 | 582.75 ft |
| 7 | April 10, 1938 | 582.20 ft |
| 8 | March 18, 1990 | 582.00 ft |
| 9 | July 12, 1996 | 582.00 ft |
| 10 | December 31, 1901 | 581.70 ft |
| 11 | March 15, 1909 | 581.20 ft |
| 12 | December 12, 1919 | 581.20 ft |
| 13 | March 5, 1979 | 580.90 ft |
| 14 | January 4, 1937 | 580.90 ft |
| 15 | February 12, 1921 | 580.70 ft |
| 16 | February 24, 2019 | 578.90 ft |
| 17 | December 31, 2015 | 578.50 ft |
| 18 | March 27, 1964 | 578.50 ft |
| 19 | December 19, 1961 | 576.80 ft |
| 20 | February 14, 2020 | 576.80 ft |
| 21 | May 9, 2003 | 576.10 ft |
| 22 | March 26, 2021 | 575.60 ft |
| 23 | May 1, 1963 | 575.60 ft |
| 24 | January 8, 2009 | 574.70 ft |
| 25 | November 13, 2009 | 574.10 ft |
Most recent crests
- March 26, 2021: 575.60 ft
- April 15, 2020: 573.40 ft
- March 26, 2020: 574.00 ft
- March 7, 2020: 573.20 ft
- February 14, 2020: 576.80 ft
- December 24, 2019: 570.20 ft
- April 21, 2019: 570.50 ft
- March 17, 2019: 572.30 ft
- February 24, 2019: 578.90 ft
- January 6, 2019: 572.50 ft
Nearby
Upstream, downstream and the gauges around this one.
What this means
Forecasts by the Southeast River Forecast Center. Forecasts are not available. Only observed stages are available for this point. Stage measured manually and reported by river observer. No automated gauge on-site. Gauge readings can be affected by backwater from downstream lake.
Sources
Stage, flood stages, impacts and crest history from NOAA’s National Water Prediction Service.