Rivers in Georgia

Chattahoochee River at GA 280 near Atlanta

Fulton County, GeorgiaNWS CHAG1USGS 02336490Peachtree City office

Below flood stage
6.63ftStage

Observed Wed, Sep 23, 6:15 AM EDT

Flood stage
24.00 ft
Forecast crest
5.20 ftThu, Sep 24, 2:00 AM EDT
Record crest
35.98 ft2009

Open the live map with the river flood outlook

Flood stages and impacts

CategoryStage
Major flood31.00 ft
Moderate flood28.00 ft
Minor flood24.00 ft
Action22.00 ft
  1. 36.00 ftRecord flooding inundates the area around South Cobb Drive. Flood waters 1 to 12 feet deep cover the railroad tracks. Several commercial buildings off South Cobb Drive and River View Road and a portion of Plant McDonough and Paul Avenue will be under 7 feet of water. A few homes will be flooded. Most of a cement plant including their sales office will be flooded with 1 to 6 feet of water. A supply line railroad bridge will be topped several feet deep. This will be similar to the September 2009 flood event.
  2. 34.00 ftWidespread inundation flooding surrounds South Cobb Drive. Flood waters 1 to 10 feet deep cover the railroad tracks in this area. Several commercial buildings off South Cobb Drive and River View Road will be flooded. Portions of a river access road on Plant McDonough and Paul Avenue will be under 6 feet of water. A few homes will be flooded. Half of a cement plant including their sales office will be flooded with 1 to 4 feet of water. A supply line railroad bridge will be topped with potential damage.
  3. 32.00 ftWidespread inundation flooding surrounds South Cobb Drive. Flood waters 1 to 8 feet deep cover the railroad tracks in this area. Flood waters enter commercial buildings off South Cobb Drive and River View Road. Portions of a river access road on Plant McDonough and Paul Avenue will be under 4 feet of water. A few homes will be flooded. Portions of a cement plant will be flooded with 1 to 2 feet of water. Flooding begins in their sales office. Half of a supply line railroad bridge will be topped.
  4. 31.00 ftMajor flooding begins. Widespread inundation flooding occurs from the gage on South Cobb Drive. Flood waters 1 to 7 feet deep cover the railroad tracks in this industrial area. Flood waters enter commercial buildings off South Cobb Drive and River View Road. Portions of a river access road on Plant McDonough and Paul Avenue will be under 3 feet of water. A few homes will begin to flood. Low lying areas of a cement plant near their detention pond and a supply line railroad track will begin to flood.
  5. 30.00 ftSignificant flooding expands upstream and downstream from the gage on South Cobb Drive. Flood waters 1 to 6 feet deep cover the railroad tracks in this industrial area. Flood waters begin to enter commercial buildings off South Cobb Drive and River View Road. A portion of a river access road on the Georgia Power Plant McDonough will be under two feet of water. The water level reaches the parking lot of the sales office at a cement plant and a portion of Paul Avenue will be under two feet of water.
  6. 28.00 ftModerate flooding begins. Significant flooding occurs along the river upstream and downstream from the gage on South Cobb Drive. Flood waters 1 to 4 feet deep cover the railroad tracks in the industrial area on both sides of the river. The water level approaches the parking lot of the sales office at a cement plant and begins to flood a portion of Paul Avenue. Also a portion of a the river access road on the Georgia Power Plant McDonough begins to flood.
  7. 26.00 ftMinor flooding continues in the woodlands and fields along the river upstream and downstream from the gage on South Cobb Drive. Flood waters one to two feet deep cover portions of the railroad tracks in the industrial area on both sides of the river. The water level approaches the foundations of a few commercial buildings in the area.
  8. 24.00 ftFlood stage is reached. Minor flooding occurs of the woodlands and fields in the natural flood plain upstream and downstream from the gage on South Cobb Drive. The water level reaches the railroad tracks in the industrial area on both sides of the river near the bridge.
  9. 22.00 ftBankfull conditions are reached along the river upstream and downstream from the gage on South Cobb Drive.

Flood outlook

Chance of flooding, September to November

CategoryChance
Minor flooding7%
Moderate floodingUnder 5%
Major floodingUnder 5%

The three-month chances are the River Forecast Centers’ long-range flood outlook, issued September 15, 2026.

Crest history

14 crests on NOAA’s list since 1979.

#DateStage
1September 22, 200935.98 ft
2September 27, 202432.22 ft
3March 17, 199031.51 ft
4April 13, 197930.71 ft
5September 17, 200430.29 ft
6February 3, 198228.91 ft
7October 5, 199528.73 ft
8November 11, 200927.86 ft
9December 29, 201827.52 ft
10October 11, 202027.46 ft
11April 19, 201926.33 ft
12September 17, 202024.82 ft
13February 13, 202524.08 ft
14May 3, 201024.04 ft

Most recent crests

  • February 13, 2025: 24.08 ft
  • September 27, 2024: 32.22 ft
  • October 11, 2020: 27.46 ft
  • September 17, 2020: 24.82 ft
  • April 19, 2019: 26.33 ft
  • December 29, 2018: 27.52 ft
  • May 3, 2010: 24.04 ft
  • November 11, 2009: 27.86 ft
  • September 22, 2009: 35.98 ft
  • September 17, 2004: 30.29 ft

Nearby

Upstream, downstream and the gauges around this one.

What this means

Forecasts by the Southeast River Forecast Center. Forecasts are issued routinely year-round. Automated gauge readings are now available, courtesy of the USGS. River forecasts for this location take into account past precipitation and the precipitation amounts expected approximately 48 hours into the future from the forecast issuance time.

Sources

Stage, flood stages, impacts and crest history from NOAA’s National Water Prediction Service. Streamflow and the daily record from the U.S. Geological Survey.